Saigon River nipa palm-shaped pedestrian bridge set to be joined on Oct 21
The main arch of the Saigon River pedestrian bridge in downtown Ho Chi Minh City is scheduled for joining on October 21. This follows successful factory load tests of its 3,400-ton arch structure and supporting frame.

The Saigon River pedestrian bridge, located in downtown Ho Chi Minh City, is slated to have its main arch joined on October 21. This significant construction milestone comes after the successful completion of factory load tests. The tests were conducted on the bridge's substantial 3,400-ton arch structure and its accompanying supporting frame. These crucial evaluations were performed prior to the transportation of the components to the installation site. The bridge, designed with a distinctive nipa palm shape, will connect the city's central areas, enhancing pedestrian access and urban connectivity. Its completion marks a notable development in the city's infrastructure projects. The joining of the main arch is a critical step towards the bridge's final assembly and opening to the public.
Key points
* Main arch of Saigon River pedestrian bridge to be joined on Oct 21.
* Factory load tests on the 3,400-ton arch structure and frame were successful.
* The bridge is located in downtown Ho Chi Minh City.
Nguồn / Source: VnExpress International
Ask The Guide to summarize, translate, or find related places and events.
Open Companion