Back to News
thoi su· 1 min read

Saigon River waterway to close temporarily as $38mn pedestrian bridge's main span joined

Waterway traffic on the Saigon River in Ho Chi Minh City will be temporarily suspended on October 19, 21, and 22. This closure is to facilitate the installation and joining of the main steel arch of a pedestrian bridge. The bridge is valued at nearly VND1 trillion (US$38 million).

Source: Tuổi Trẻ News·October 13, 2026

Waterway traffic on the Saigon River in Ho Chi Minh City is scheduled for temporary suspension on specific dates. These dates are October 19, 21, and 22. The purpose of this suspension is to allow for the critical process of installing and joining the main steel arch of a new pedestrian bridge. This significant infrastructure project is valued at nearly VND1 trillion, which translates to approximately US$38 million. The temporary closure is essential to ensure the safety and efficiency of the construction work involving large structural components over the river. This measure will impact watercraft navigating through the affected section of the river during the specified periods.

Key points
* Saigon River waterway traffic will be suspended on October 19, 21, and 22.
* The closure is for installing and joining the main steel arch of a pedestrian bridge.
* The pedestrian bridge project is valued at nearly VND1 trillion (US$38 million).

Nguồn / Source: Tuổi Trẻ News

Original source
Tuổi Trẻ News
Discuss with The Guide

Ask The Guide to summarize, translate, or find related places and events.

Open Companion